Remodel of 9374 Fleetwood, Cypress CA

Dream Home Comes to Life

Project Description: Exterior wood repairs, paint and re-landscape. Interior scraped ceilings, paint, new kitchen, bathrooms, flooring, light and plumbing fixtures.
Project Duration:
4-5 weeks
Project Cost: $75,000
Expected Total Increase in Value: $200,000 to $250,000


A complete curb appeal refresh with new landscaping, updated woodwork, a new garage door, and fresh exterior paint.

A full living room transformation with new flooring, fresh paint, and updated fixtures.

Updated bathroom featuring a resurfaced shower, new vanity and countertops, new flooring, and updated plumbing and light fixtures.

Completely reimagined from busy and outdated to a fresh, cohesive space with new flooring and lighting.

Revitalized with bright cabinetry, updated floors, and modern lighting for a fresh, welcoming kitchen.

Gone from dark and cluttered to bright, clean, and refreshed with updated flooring and paint.

Open and refreshed for maximum brightness with new flooring and clean walls.

Turned from dim and outdated to a bright, modern bedroom space.

Open and refreshed for maximum brightness with new flooring and clean walls.

Similar Posts